PROJECT
TITLE: New Swimming Pool Ref: 6052-Leisure/Sports
PROJECT DETAILS:
Location: St Mary's Bay
Holiday Park, Brixham, Devon
Client: Weststar Holidays
Ltd
Procurement Method: Selective
Tenders based upon Bills of Quantities, Drawings and JCT Contract.
Commencement Date: Oct
1999
Completion Date: March
2000
Contract Value: £250K
- £500K
DESCRIPTION OF THE PROJECT:
This swimming pool was
part of the winter programme for 1999/2000 season undertaken
by a long standing client of ours, Weststar Holidays Ltd.
The works where undertaken concurrently with the refurbishment
of 130 chalets. The pool building was steel framed with a
combination of patent glazing and insulated steel cladding.
The pool itself was constructed using reinforced hollow blockwork
built of a reinforced concrete slab. The pool is a level deck
type with a balancing tank at one end and was built at ground
level to utilise the existing step in ground levels on the
site. The building was built as a lean-to type extension against
the existing clubhouse building and adjacent parts of the
existing building were altered to form the plant room and
changing facilities. The plant included air conditioning,
filtration and a combined gas fired boiler for both the air
conditioning and pool.
CONSULTANT SERVICES PROVIDED:
The Pre-Contract Services
carried out on this project involved the initial budgeting,
the preparation of the Bills of Quantities and the reporting
and advising on the selection of the tenders received.
The Post-Contract Services
carried out on this project involved regular cost monitoring
and reporting on the project, carrying out and certifying
of monthly valuations and the preparation of the final account.